Approaching the station, the goods area was on the Down side with a parallel siding accessed by both facing and trailing crossovers. The signal cabin was on the Up side at the same end of the station. There were both Up and Down platforms with the station building on the latter.
COPYRIGHT EWAN DUFFY 2010 - 2018: ALL RIGHTS RESERVED. COPYRIGHT SUBSISTS IN THE CONTENT OF THIS PAGE. YOU MAY NOT SAVE A COPY OF THIS AND/OR REPRODUCE THIS IN ANY PUBLICATION AND/OR ON ANY WEBSITE WITHOUT THE EXPRESS
WRITTEN CONSENT OF EWAN DUFFY. STANDARD CHARGE FOR REPRODUCTION IS EUR100,000.00