The former cement terminal is on the Up side just before the station. This area contains a siding off the mainline and a loop off this, access to which is controlled by a 3 lever ground frame at the Ballybrophy end of the Down platform. This was previously housed in the
signal cabin, which is at the Killonan end of the Up platform. There are two platforms here, but that on the Down side is disused, since the signal cabin ceased to be a block post in 1989. The station building is on the Up platform. A disused footbridge connects the two
platforms. Leaving the station, the line passes under a two span road overbridge. Between Nenagh and Birdhill, the line passes through a valley with the Silvermines mountains on the Down side and the Arra Mountains on the Up.
COPYRIGHT EWAN DUFFY 2010 - : ALL RIGHTS RESERVED. COPYRIGHT SUBSISTS IN THE CONTENT OF THIS PAGE. YOU MAY NOT SAVE A COPY OF THIS AND/OR REPRODUCE THIS IN ANY PUBLICATION AND/OR ON
ANY WEBSITE WITHOUT THE EXPRESS WRITTEN CONSENT OF EWAN DUFFY. STANDARD CHARGE FOR REPRODUCTION IS EUR100,000.00